Capodichino Airport – Naples

Enhancement and optimization of services and infrastructures through the creation of new check-in counters and ticket offices at the Naples International Airport, first in the south for passenger volume.
Work carried out without interruption 24 hours a day so as not to interrupt the airport service departing and arriving
– All electrical, anti-burglar, fire-fighting and air-conditioning systems have been designed to be managed and controlled by supervision and remote management systems using hardware and software. In addition, primary air treatment and conditioning have been carried out. A steel shelter directly adjacent to the landing strips for the reception of luggage trolleys
– 5,000 square meters of aluminum and plasterboard false ceilings in fiber
– 5,000 square meters of floating floor
– Construction of check-in counters, ticket offices and luggage treadmills
– Construction of a shelter in c.a and metallic carpentry in progress towards the landing strips
– 20,000 ml of electric cables
– 10,000 ml of special cables
– 5.000 ml of fiber optic cables
– average workforce employed about 20 workers assigned to the various tasks
2017-12-12T11:53:26+00:00