Hospital of Cerreto Sannita – Benevento

Adaptation to the first aid department of the Cerreto Sannita Hospital Presidium as well as to the expansion of the hospital activities in relation to radiology, laboratories for the analysis, restructuring and compliance with the inpatient departments of surgery and orthopedics
– construction of a gas-medicinal plant and related production and distribution plants
– Supply and installation of 3 UTA air treatment units and two groups of refrigeration units for air conditioning
– Implementation of lighting system with remote control electronic systems and remote control with related data transmission systems realized with optical fiber; Photometric, radiometric and colorimetric measurement for interiors and exteriors as well as control for the protection of visual hygiene
– 4,500 square meters of floor and wall tiles in stoneware
– 1,200 square meters of plasterboard false ceilings
– 500 MQ of PVC frames
– 200 MQ of shielded panels for “X” rays
– average workforce employed about 20 workers assigned to the various tasks
2022-03-26T20:19:43+00:00